PAGES

September 2, 2014

I-35W Construction Information

The reconstruction on I-35W from I-820 to I-30 is referred to as "Segment 3A".

The mandatory scope schematics for the I35 reconstruction are posted at http://www.txdot.gov/government/partnerships/current-cda/north-tarrant-express/interim-project.html.

Please note that the documents at that website reflect the original schematic design; they do not reflect the design changes that have been implemented and were recently presented to ONA.  A PDF copy of that presentation (showing the improvements to the design) is posted below.

TxDOT ONA Presentation

To stay up-to-date on road conditions, visit TxDOT's Drive Texas page:  http://www.txdot.gov/driver/travel/highway-conditions.html.  You may also sign up for e-Alerts from North Tarrant Express:  https://secure7.easyasphosting.com/NorthTarrantExpress-com/GetAlerts.asp.

No comments:

Post a Comment